Commercial Interior
Office buildings, restaurants, and retail demolition for renovations and returning spaces to white box conditions.
Structural Deconstruction
Project: Christy Sports Corporate Headquarters
Location: Boulder, CO
Description: Removed precast concrete “double-tee” roof with 300 ton hydraulic crane. Interior renovation included gutting finishes, removing M.E.P., structural wall demolition, and asbestos abatement.
Structural Deconstruction
Project: Christy Sports Corporate Headquarters
Location: Boulder, CO
Description: Removed precast concrete “double-tee” roof with 300 ton hydraulic crane. Interior renovation included gutting finishes, removing M.E.P., structural wall demolition, and asbestos abatement.
Health Care
Project: Rocky Mountain Eye Institute at University of Colorado Hospital
Location: Aurora, CO
Description: Selective demolition of roof and building brick façade to enable expansion of medical facility. Utilized crane to remove stairwell tower without disturbance to active hospital. Interior demolition was performed using infectious control measures to protect patients and medical staff.
Industrial
Project: Rocky Mountain Eye Institute at University of Colorado Hospital
Location: Aurora, CO
Description: Selective demolition of roof and building brick façade to enable expansion of medical facility. Utilized crane to remove stairwell tower without disturbance to active hospital. Interior demolition was performed using infectious control measures to protect patients and medical staff.
Government
Project: Denver International Airport
Location: Denver, CO
Description: Utilized 500 ton hydraulic crane to remove bridge deck and girders as part of the new hotel and site improvements. Bridge remained active to airport traffic during demolition and the demolition means and methods were specifically engineered to minimize disturbance to airport operations.