Engineered Demolition, INC

Government

Project: Denver International Airport

Location: Denver, CO

Description: Utilized 500 ton hydraulic crane to remove bridge deck and girders as part of the new hotel and site improvements.  Bridge remained active to airport traffic during demolition and the demolition means and methods were specifically engineered to minimize disturbance to airport operations.

Industrial

Project: Rocky Mountain Eye Institute at University of Colorado Hospital

Location: Aurora, CO

Description: Selective demolition of roof and building brick façade to enable expansion of medical facility.  Utilized crane to remove stairwell tower without disturbance to active hospital.  Interior demolition was performed using infectious control measures to protect patients and medical staff.

Commercial Interior

Description: Office buildings, restaurants, and retail demolition for renovations and returning spaces to white box conditions.

Structural Deconstruction

Project: Christy Sports Corporate Headquarters

Location: Boulder, CO

Description: Removed precast concrete “double-tee” roof with 300 ton hydraulic crane.  Interior renovation included gutting finishes, removing M.E.P., structural wall demolition, and asbestos abatement.

Health Care

Project: Rocky Mountain Eye Institute at University of Colorado Hospital

Location: Aurora, CO

Description:

Selective demolition of roof and building brick façade to enable expansion of medical facility.  Utilized crane to remove stairwell tower without disturbance to active hospital.  Interior demolition was performed using infectious control measures to protect patients and medical staff.