Location: Denver, CO
Selective demolition of upper stadium precast concrete to make way for the new rooftop deck. Utilized a 500 ton hydraulic crane with a smaller support crane positioned on the level 300 deck to finish ahead of a very compressed schedule during the MLB off-season.